Category A and B projects

Following the OECD Recommendation and internal procedures, the Agency discloses information on Environmental and Social Impact Assessment (ESIA) of Category A projects.

Questions on environmental and social aspects of the project can be addressed to EXIAR at moshkina@exportcenter.ru

1

2020 year

Expand
Minimize
Project name
Country
 
Category Description of the project
and level of social-environmental risk
Applicable
international
standards
Provided by
documentation
Construction
of the Amur
Gas Processing
Plant (GPP)
Amur Region
Russia  A The project includes
the construction of Russia's largest
gas processing plant with a design
capacity of 42 billion cubic
meters.meters of gas per year,
as well as the associated railway
and port infrastructure. Marketable
products also include ethane,
propane, butane, pentane-hexane fraction and helium.

The overall level of social
and environmental risk is
assessed as high.
  • IFC Performance Standards:
SD 1, SD 2, SD 3, SD 4, SD 6

  • IFC General Environmental,
Health and Safety Guidelines IFC

  • Environmental, health and 
safetyguidelines for natural gas processing, for ports, marinas
and terminals.
IFC General Environmental,
Health and Safety Guidelines IFC
Construction of a solar
power plant (SPP) in the
city of Kentau,
Turkestan region
Kazakhstan A Construction of a solar power plant
with a capacity of 50 MW.
Photovoltaic modules are adopted
as the main generating equipment for SPP.

The general level of social and environmental risk is assessed
as medium.
  • IFC Performance Standards:
 SD 1, SD 2, SD 3, SD 4
  • IFC General Environmental,
Health and Safety Guidelines IFC
EIA materials in
accordance with
national requirements, additional information.
Expansion of the
port terminal at
the Ust-Luga
Commercial Sea
Port of the Leningrad Region
Russia 
B The project includes the
construction of port infrastructure
facilities (warehouses, railway
access, berths) for the storage and transshipment of mineral fertilizers 
and general cargo.

The general level of social and environmental risk is assessed
as medium.
  • IFC Performance Standards:
SD 1, SD 2, SD 3, SD 4

  • IFC General Environmental,
Health and Safety Guidelines IFC
EIA materials in
accordance with
national requirements, additional information.

Additional Information: https://blagoveshchensk-pererabotka.gazprom.com/ecology/
2

2019 year

Expand
Minimize
Project name
Country
 
Category Description of the project
and level of social-
environmental risk
Applicable
international
standards
Provided by
documentation
Construction
of a solar power
plant (SPP) in the
Tselinograd district
of the Akmola
region
Kazakhstan  B Construction of a solar power plant
with a capacity of 100 MW. Photovoltaic
modules are adopted as the main generating equipment for SPP.

The overall level of social
and environmental risk is
assessed as medium.
  • IFC Performance Standards:
SD 1, SD 2, SD 3, SD 4

  • IFC General Environmental,
Health and Safety Guidelines IFC
EIA materials in
accordance with national
requirements, additional information.

3

2018 year

Expand
Minimize
Project name
Country
 
Category Description of the project
and level of social-
environmental risk
Applicable
international
standards
Provided by
documentation
Design and construction
of a metallurgical plant
Uzbekistan  B The project includes the construction
of a plant for the production of cold-
rolled steel products with a capacity
of 500 thousand tons of cold-rolled products per year.

The overall level of social
and environmental risk is
assessed as medium.
  • IFC Performance Standards:
SD 1, SD 2, SD 3, SD 4, SD 5

  • IFC General Environmental,
Health and Safety Guidelines IFC

  • Environmental, Health
and Safety Guidelines
for Steel Mills
EIA materials in
accordance with national
requirements, additional information.

4

2017 year

Expand
Minimize
Project name
Country
 
Category Description of the project
and level of social-
environmental risk
Applicable
international
standards
Provided by
documentation
OLTIN YO`L GTL
plant construction
Uzbekistan A The project includes the construction
of a plant for the production of liquid
hydrocarbon products (naphtha,
kerosene, diesel fuel and liquefied
petroleum gas) based on purified
methane from the Shurtan Gas
Chemical Complex with a capacity of 38 thousand barrels / day.

The overall level of social and
environmental risk is assessed as high.
  • IFC Performance Standards:
SD 1, SD 2, SD 3, SD 4, SD 6, SD 8

  • IFC General Environmental,
Health and Safety
Guidelines IFC

  • IFC Environmental, Health
and Safety Guidelines for
Natural Gas Processing

Reconstruction of the Minsk Power Plant
Belarus B The project includes the replacement of
individual equipment and the expansion of existing production within an existing production site in an industrial area.

The general level of social and
environmental risk is assessed
as medium.
  • World Bank Conservation 
Policy:  Environmental Expertise (OP 4.01)
Sections of environmental
protection, labor protection Materials of justification of investments and other related materials

5

2016 year

Expand
Minimize
Project name
Country
 
Category Description of the project
and level of social-
environmental risk
Applicable
international
standards
Provided by
documentation
Yamal LNG project
Russia   A The project for the construction of a liquefied
natural gas complex with a design production
capacity of 15.0 to 16.5 million tons of liquefied
gas per year includes the construction of
drilling sites, installations for the collection,
treatment and liquefaction of gas, an
installation for storage and shipping
of LNG, a seaport , an airport.

The overall level of social
and environmental risk is
assessed as high.
  • IFC Performance Standards:
SD 1, SD 2, SD 3, SD 6, SD 7

  • IFC General Environmental,
Health and Safety Guidelines

  • Onshore Oil and Gas 
Production Guide

  • LNG Production Guide;

  • Thermal Power Plant Guide

  • Waste Management 
Facilities  Manual

  • Guide for Ports, Harbors 
and  Terminals

  • Airport management
ESIA materials and additional
documentation, information
obtained during the site visit.